FIRE BAN
NOT IN EFFECT

Provincial Fire Bans
Home
County Council
The County
Office
County Profile
Economic Development
Business Permits
Industry Liaison
Agriculture Service Board
Taxes & Assessment
Planning & Development
Natural Gas
Waste Collection & Hauling
Water & Sewer Services
Protective Services
Public Works
Hamlets & Resorts
Town & Villages
Parks & Recreation
Family & Community Services
FAQ's
Useful Links
Jobs with the County
Contact Information
Search Site
|
Public Works
Contact and department information...

Notice to Register Contract Equipment
Owners of gravel truck(s) with belly dump trailer(s), water truck(s) and
road construction equipment are asked to register their equipment at the
County Shop. All owners must complete a Registration Form, outlining the
equipment description, model, serial number, year as well as proof of
insurance coverage, with two million dollars liability and WCB Account.
Road Bans - Weight Restriction
All OILED BASED roads within the County have a 75% weight restriction
YEAR ROUND. The past three years the County has not put a weight
restriction on gravel roads. However, the County requests the
cooperation of all farmers, contractors, heavy equipment haulers and the
oil & gas industry to haul on GRAVEL roads when the frost is in the
gravel roads, normally between 10 PM - 9 AM.
Please
DO NOT haul on gravel roads when the conditions are soft.
If you
see damage on County roads, please contact the County Shop at 656-3755
and report the location.
Thank
you for your cooperation in this matter.
Public Works Manager Report
Our Department, once again, had to
contend with various weather conditions in 2010. We were able to
complete our regular maintenance programs of gravelling County roads,
patching oil base road sections and repair and installation of culverts.
We were also successful in completing rehabilitation, construction, base
stabilization and individual dust control projects. Unfortunately, due
to periodic rains throughout the summer, the department fell behind in
oil treatment of various arterial roadways. We will do our best to catch
up in 2011.
The Hydro-Axe and Brushing programs
will once again continue providing better site lines for safer travel
throughout Smoky Lake County.
The Rock Excavation Program at White
Earth Pit will resume from spring thaw until freeze-up. This work from
here on forward will take place using County equipment; track hoe and
rock truck, along with County operators. Gravel crushing will once again
take place this spring to be completed by mid July.
The County, at various times
throughout the year, provides different training programs, which enable
our staff to provide the best service possible. Keeping our roads
comfortable for travel while battling different weather conditions.
In conjunction with Alberta
Transportation and Associated Engineering Smoky Lake County maintains a
Bridge Management Program. Bridges are inspected, deficiencies are noted
and recommendations are made to Alberta Transportation. Upon approval,
bridges are repaired or replaced on a priority basis.
Thank you to all the ratepayers for
calls pointing our hazards such as fallen trees or washouts. It is much
appreciated.
We hope to have a successful
maintenance and construction year and appreciate your patience as we
complete our projects.
Doug Ponich
Public Works Manager
2011 Gravel Rates (per tonne)
|
Material |
Ratepayers |
Others |
|
Material only |
$12.00 |
$14.00 |
|
With Delivery (Tandem) |
$20.00 |
|
|
With Delivery (Belly Dump) |
$17.00 |
|
2011
Sand Rates (per tonne)
|
Material |
Ratepayers |
Others |
|
Material only |
$4.00 |
$6.00 |
|
With Delivery (Tandem) |
$12.00 |
|
|
With Delivery (Belly Dump) |
$9.00 |
|
Belly Dump
Average loaded weight 28.60 tonne
Average total truck weight loaded 45.5 kg
Delivered Gravel Tandem
Average loaded weight 12.47 tonne
Average total truck weight loaded 22.5 kg
2010
Completed Road Projects
PAVING, OIL TREATMENT & BASE STABILIZATION
|
Project Name |
Days |
Length |
Estimate |
Actual
|
|
Saddle
Lake Road |
6 |
4 ½ mi |
747,052.56 |
17,864.82 |
|
Goodfish
Lake Road |
11 |
8 ½ mi |
1,411,099.28 |
1,134,728.69 |
|
Twp 620
between RR 134A-140A |
3 |
2 ¼ mi |
260,241.25 |
75,818.18 |
|
RR 170
between Twp 590-592 |
2 |
2 mi |
188,870.00 |
Cancelled /Reallocated |
|
RR 170
between Twp 602-600A |
2 |
1 ¼ mi |
124,512.50 |
154,560.05 |
|
Twp 602
between RR 170-164 |
3 |
1.06mi |
101,833.14 |
33,159.08 |
|
RR 180
between Twp 595-600 |
2 |
1 mi |
90,610.00 |
Moved to 2011 |
|
RR 183
between Twp 602-601 |
1 |
1 mi |
100,050.00 |
Moved to 2011 |
|
Twp 584
btwn Hwy 859 – RR 144 |
5 |
5 mi |
72,296.00 |
70,622.49 |
|
Twp 584
btwn Hwy 855 – RR 170 |
2 |
4 mi |
44,000.00 |
45,836.33 |
|
Twp 612
between RR 173 – 174A |
1 |
1 ½ mi |
21,450.00 |
17,686.01 |
|
Twp 604
between RR 181 – 192A |
3 |
4 ½ mi |
146,997.00 |
67,863.43 |
|
Twp 610
between RR 181 - Hwy 855 |
3 |
4 mi |
130,664.00 |
43,304.59 |
|
RR 181
between Twp 610 - 604 |
2 |
2 mi |
65,332.00 |
24,006.01 |
|
Twp 612
between RR 174A - 175 |
1 |
½ mi |
7,409.50 |
8,228.13 |
|
Twp 610
between Hwy 855 - RR 170 |
2 |
3 mi |
45,600.00 |
23,626.51 |
|
Hamlet of
Bellis |
|
|
29,466.00 |
32,840.00 |
|
TOTAL |
49 |
46.6 |
3,587,483.23 |
1,750,144.32 |
REHABILITATION
|
Project Name |
Days |
Length |
Estimate |
Actual |
|
Twp 610 btwn RR 181 – Hwy 855 |
5 |
4 mi |
18,511.98 |
14,075.02 |
|
RR 174 btwn Twp 590 – Hwy 28 |
3 |
2 ½ mi |
45,000.00 |
23,806.95 |
|
Twp 592 between RR 170 – 171 |
1 |
1 mi |
18,000.00 |
21,035.82 |
|
RR 170 between Twp 595 – 600 |
2 |
1 mi |
25,000.00 |
14,324.36 |
|
RR 195 between Twp 594 – 600 |
2 |
2 mi |
38,000.00 |
28,509.96 |
|
RR 164 south of Twp 584A |
|
|
1,664.18 |
2,839.59 |
|
TOTAL |
13 |
10 1/2 |
146,176.16 |
104,591.70 |
CONSTRUCTION CONTRACTED OUT
|
Project Name |
days |
Length |
Estimate |
Actual |
| RR
140 between Twp 590-584 |
30 |
2.0
mi |
294.000.00 |
228.158.38 |
|
TOTAL |
30 |
2.0 mi |
294.000.00 |
228.158.38 |
Construction
| Project Name |
days |
Length |
Estimate |
Actual |
| Intersection RR 143 - Twp 590 |
|
|
3,.000.00 |
7,122.37 |
| RR 131 between Twp 580 - 583A |
|
2.3 mi |
12,887.58 |
8,801.66 |
| TOTAL |
|
2.3 |
42,887.58 |
15,924.03 |
2011 Road Projects
PAVING, OIL
TREATMENT
|
Project Name |
Days |
Length |
Estimate |
|
Saddle Lake Road |
7 |
4.5 mi |
780,639.18 |
|
Twp 620 between RR 140A - 142 |
3 |
1 ¾ mi |
229,806.00 |
|
Twp 620 between RR 134A - 140A |
3 |
2
¼
mi |
217,739.01 |
|
RR 170 between Twp 592 - Hwy 28 |
3.5 |
2 mi |
220,168.00 |
|
RR 170 between Hwy 28 - Twp 595A |
2 |
1 ½ mi |
194,705.00 |
|
Twp 602 between RR 170 - 164 |
3 |
1.1 mi |
86,340.92 |
|
RR 180 between Twp 595 - 600 |
2 |
1 mi |
125,250.00 |
|
Twp 604 between RR 181 - 192A |
10 |
7 ½
mi |
1,344,170.00 |
|
RR 181 between Twp 604 - 610 |
3 |
2 mi |
358,445.00 |
|
Twp 610 between RR 181 - Hwy 855 |
6 |
4 mi |
720,192.00 |
|
Twp 600 between RR 180 - 181A |
2 |
1.15 mi |
151,142.00 |
|
RR 183 between Twp 602 - 601 |
2 |
1 mi |
130,000.00 |
|
Twp 584 between Hwy 855 - RR 172 |
1 |
2 mi |
38,000.00 |
|
Twp 584 between Hwy 855 - RR 180 |
2 |
2 mi |
38,000.00 |
|
Mons Lake and Sandy Lane |
4 |
1.58 mi |
141,830.00 |
|
TOTAL |
53.5 |
|
4,776,427.11 |
REHABILITATION
|
Project Name |
Days |
Length |
Estimate |
| Twp
584 between Hwy 859 - RR134 |
1.5 |
1 mi |
20,000.00 |
| Twp
592 between RR 174 - Hwy 855 |
2 |
2 |
20,000.00 |
|
TOTAL |
3.5 |
2 |
40,000.00 |
CONSTRUCTION - Contracted Out
|
Project Name |
Days |
Length |
Estimate |
|
RR 141 between Twp 583 – 584 |
23 |
1 |
225,000.00 |
|
Bellis Sidewalk |
|
|
33,000.00 |
|
TOTAL |
23 |
1 |
258,000.00 |
CONSTRUCTION
|
Project Name |
Days |
Length |
Estimate |
|
RR 131 between
Twp 580 - 583A |
|
2.3 |
4,085.92 |
|
Intersection RR
143 - Twp 590 |
|
|
22,877.63 |
|
TOTAL |
|
2.3 |
26,963.55 |
Road Categories &
Gravel Program
|
Categories |
Description |
Code |
Material Per Mile |
Years |
|
Exceptional |
Extreme traffic and Heavy loads |
Exc |
175 - 140 |
Annual |
|
Category 1 |
Paved and oiled roads |
C1 |
---- |
-- |
|
Category 2 |
High usage arterial and feeder gravel roads |
C2 |
187 - 150 |
2 |
|
Category 3 |
Moderate usage collector gravel roads with through traffic and
serving several residents |
C3 |
156 - 125 |
3 |
|
Category 4 |
Little used and dead end roads |
C4 |
125 - 100 |
4 |
Graveling Per Category
|
Miles |
Code |
Recommended Miles |
Recommended Gravel |
Estimate Costs |
|
33.5 |
Exc |
11.5 |
2,012.5 |
28,700.00 |
|
93.0 |
C1 |
--- |
--- |
--- |
|
143.5 |
C2 |
66.0 |
12,342.0 |
235,246.50 |
|
508.0 |
C3 |
146.0 |
22,776.0 |
401,076.00 |
|
130.0 |
C4 |
34.0 |
4,255.0 |
79,562.50 |
|
Total
908 |
|
Total |
41,380.50 |
744,584.50 |
Graveling Per Division
|
Miles |
Code |
Recommended Miles |
Recommended
Gravel |
Estimate Costs |
|
146.5 |
PW45 |
38.5 |
6,331.50 |
132,961.50 |
|
222.0 |
PW46 |
73.0 |
11,698.0 |
269,054.00 |
|
157.0 |
PW47 |
48.0 |
7,696.0 |
107,744.00 |
|
162.5 |
PW48 |
48.5 |
7,700.5 |
115,507.50 |
|
221.0 |
PW49 |
49.5 |
7,954.5 |
119,317.50 |
|
Total 908.0 |
|
257.5 |
41,380.5 |
744,584.50 |
|
Contingency |
|
|
5,000.0 |
90,000.00 |
|
Total |
|
|
46,380.5 |
834,584.50 |

|